Walk Way Compaction
A walkway compaction project in Kamuli, Uganda
View ProjectRehabilitation and widening of a 34 km strategic highway corridor connecting Jinja city to Iganga town in Eastern Uganda.
Project Overview
The Jinja–Iganga Road Rehabilitation project involves the full reconstruction and widening of a 34 km section of the strategic Eastern Corridor highway. Works include earthworks, sub-base and base-course preparation, asphalt surfacing, bridge repairs, storm-water drainage channels, road markings, and the installation of solar-powered streetlights at key junctions. Survic Construction is acting as main contractor under a Uganda National Roads Authority (UNRA) contract. The project is expected to cut travel times by 40 % and significantly improve road safety along one of Uganda's most heavily trafficked freight routes. Completion is scheduled for Q4 2025.
Project Gallery
Let's Build Together
Inspired by what we've built? Get in touch today for a free consultation and discover how Survic Construction can bring your vision to life.